Project : Marks & Spencer Al-Futtaim Warehouse Pelabuhan Tanjung Pelepas, Johor
Customer : Marks & Spencer c/o Kerry Logistics (M) Sdn Bhd
Vendor/ Contractor : Green Insights Sdn Bhd
Design , Supply , Installation & Testing and Commissioning of Electrical Services and LED Lighting System
A) Electrical Services
To design and supply install sub DB Board 300A and run the submain cables for electrical services the following:
- Air-cond System for Cold Room
- Goods Lifting Hoist (2x)
- MHE Charge Unit
- Lighting DB & Power Sockets ( GF,1F, 2F Floor)
- Hibay lighting for Cold Room
- Hibay /Linear Lighting for Open Area
B) Lighting Services
To design and supply Installation of Philips LED Lighting with Motion Control system to optimize the Energy Consumption of the Warehouse with Sensor Zoning area by Aisles and Staircase Area.
The objective of the design is to achieve an average of 210 lux in working area and at the same time the lights will be lilted only where required when there is motion detected when operator’s pass by the intended working aisles.
However the walkway aisles and the cold storage room are operated by switches to give illuminance of the area for safety general illuminance of the working floors.
Below images show the installation of lights in the warehouse :